Information about home and updates -
Home purchased by Kathy & Alan Henderson May 2003
Home built = 1973
Roof = 12 years (approx.)
Siding - Aluminum = ?
A/C = 1988 PHI
Heat = 1986 PHI
Water Heater = 1995 PHI
Water Well = unknown age
Septic Field = original to house
Last service dates = May 2003 & June 2005
Appliances
Refrigerator = installed May 2003
Stove = installed May 2003
Dishwasher = installed May 2003
Garbage Disposal = installed May 2003
Range Hood = installed April 2005
Fireplace chimney sweep = by previous owners in 2002-2003
Electric = updates installed April 2005
200 amp service (from 100 amp), new outlets (TV area, Office, hallway, Master Bedroom, GFI in upstairs bathrooms), updated GFI outlets (in all bathrooms), new exterior outlets (deck and front door area), new accent lighting (foyer, family room & kitchen), new ceiling fans with lights (1st b.r. & master b.r.), hard-wired smoke detectors (upstairs hallway & downstairs), new 240v garage wiring, new 120v outlets in garage, new light fixtures (kitchen, kitchen dining table, foyer, motion/time at exterior front door, 2 motion/time at garage) , upgraded bath exhaust fan in master bath and new switches in both upstairs bathrooms, new bathroom separated task lighting in upstairs bathrooms, new overhead light in guest bath.
Master Bedroom ceiling fan has remote automated temperature and light controls.
200 amp service box has 5 empty breaker locations
2 additional circuits run from service center to attic for future accent lighting in living and dining room
(1) 240v circuit run to garage and marked on junction box for future use
(1) 120v circuit run to
garage can be expanded for additional outlets in garage
Driveway, steps and extra parking pad = installed May 2004
Lannon Stone wall = installed July-August 2004
Lannon Stone upper tier = installed May 2005
Professional landscaping = installed by previous owners September 2002
Front Beds, North bed, South bed and East Gravel area
Professional landscaping = installed April 2005
New flower beds in at Lannon Stone wall, new bushes in front 2 beds, new plants in north bed, additional Granite gravel in east area, cleared south wooded area, cleared east wooded area from north property line to shed, gravel paths in woods, brick pavers added to front of shed
Exterior Windows Shutters = installed June 2005
Concrete pad for shed = installed September 2003
Shed with 8 foot side walls = installed November 2003
Kitchen Counter and Composite-Granite Sink = installed June 2005
Kitchen Faucet = installed September 2004
Master Bath -
Tile floor, Thomasville Cabinet, Corian solid-surface, Plumbing Fixtures, Towel Bars & Hardware = install April 2005
Flooring -
Foyer ceramic tile = installed June 2005
Family Room, Steps, Hallway, 1st Bedroom and 2nd Bedroom Carpet = installed May 2003
Living Room and Dining Room Carpet = installed by previous owners approximated 2001
Master Bedroom - Hardwood floors = original to house, never refinished
Kitchen Vinyl - 2nd layer = installed by previous owners 6-10 years ago
Guest Bath Vinyl - 2nd layer = installed by pervious owners 2-6 years ago
Laundry and Office area Vinyl = unknown age
Painting -
Main Level - all walls and ceilings = May 2003
Upstairs Level - all walls and ceilings = May 2003
Office - walls and ceiling = May 2003
Master Bath - wall and ceiling = June 2005
Shed = stained June 2005
Deck = stained by previous owners May 2003 and professionally stained again June 2005
Front door = new polyurethane finish June 2005
Front storm door and mailbox post = June 2005
Basement floor = painted by previous owners April 2003
Radon Mitigation System - Pipe, gauge and Air Pump = installed June 2003
Submersible Sump Pump (sealed for Radon Mitigation) = installed June 2003
Window Treatments -
Family Room and Kitchen = installed July 2005
Living Room = installed July 2005
Master Bedroom, Master Bath, Guest Bath = installed July 2005